fbpx

SUN VALO emphasizes the responsibility and safety of systems. In this blog we take up the reasons why we do so.

The law does not currently require special permits or expertise for the installation of solar power plants, except for the S2 electrical qualification, which is required for connection to the electricity grid.

For this reason, there are operators who do not necessarily leave a professional and safe mark. The risks increase with abuse without the customer even being aware of it. Abuses also pose challenges to authorities such as fire and rescue.

If you already have a system installed, check that it is safe! Be precise about what is being sold to you and what the installation is like!